Saturday, May 16, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

Storm damage disrupts Tripura power, restoration in progress

admin by admin
29/04/2026
in Local, Politics
0
Storm damage disrupts Tripura power, restoration in progress
0
SHARES
7
VIEWS
Share on FacebookShare on Twitter

 

Successive days of violent storms and heavy rainfall have severely crippled Tripura’s electricity infrastructure, leaving widespread destruction across all eight districts and plunging large parts of the state into darkness. Preliminary assessments by the Tripura State Electricity Corporation Limited (TSECL) reveal the scale of the damage: 1,665 electric poles uprooted, nearly 746 km of conductors snapped, and 103 distribution transformers destroyed. The estimated financial loss has crossed Rs 5.59 crore.

READ ALSO

CM Hints at Pay Hike for ASHA Workers in Tripura

Tripura Governor Adopts Fuel Conservation Measure

South Tripura has emerged as the worst-affected region, particularly in Belonia, Santirbazar, and Sabroom, where 494 poles, 96 km of power lines, and 12 transformers were damaged. Sepahijala district reported 268 collapsed poles and 15 transformers lost. West Tripura, including the capital Agartala, suffered extensive disruption with 260 poles down and nearly 184 km of conductors damaged. Significant losses have also been recorded in Khowai, Gomati, North Tripura, Unakoti, and Dhalai districts.

Amid the devastation, TSECL personnel have been working tirelessly to restore electricity. Engineers and line staff have been braving relentless rain, strong winds, and hazardous conditions to repair the damaged network. In several areas, workers have put in continuous shifts of 24 to 30 hours, carrying heavy equipment, replacing poles, and clearing fallen trees, often at great personal risk.

Power Minister Ratan Lal Nath has taken direct control of the restoration efforts, closely monitoring progress and reviewing damage reports across divisions. He has directed officials to prioritize swift restoration of power supply, emphasizing the urgent need to bring relief to affected residents. TSECL Managing Director Biswajit Basu, who is leading operations on the ground, described the effort as “a fight to restore normalcy.”

The damage has also disrupted essential services, with prolonged outages affecting drinking water supply, healthcare facilities, businesses, and daily life. While the financial burden is significant—Rs 3.72 crore from conductor damage alone, Rs 83 lakh from poles, and over Rs 1 crore from transformers—the human impact remains the biggest concern.

The state government has assured full support for restoration and rebuilding, with Minister Nath praising TSECL workers for their dedication and calling their efforts “an inspiring example of public service.”

Tags: restoration in progressStorm damage disrupts Tripura power

Related Posts

CM Hints at Pay Hike for ASHA Workers in Tripura
Local

CM Hints at Pay Hike for ASHA Workers in Tripura

15/05/2026
Tripura Governor Adopts Fuel Conservation Measure
Local

Tripura Governor Adopts Fuel Conservation Measure

15/05/2026
50 Tripura Youths Placed in Bengaluru Through TRLM
Local

50 Tripura Youths Placed in Bengaluru Through TRLM

15/05/2026
Postal Department Announces Adalat in Agartala
Local

Postal Department Announces Adalat in Agartala

15/05/2026
Rising Violence in Takarjala: Tipra Motha Meets DGP
Local

Rising Violence in Takarjala: Tipra Motha Meets DGP

15/05/2026
Fuel Hike Sparks Protests and Panic Buying in Tripura
Local

Fuel Hike Sparks Protests and Panic Buying in Tripura

15/05/2026
Next Post
CM Saha: No closure of schools despite bad weather

CM Saha: No closure of schools despite bad weather

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025
“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

24/10/2024

EDITOR'S PICK

Kalikapur Jailbreak: Police Arrest 4, Search for 2 On

Kalikapur Jailbreak: Police Arrest 4, Search for 2 On

17/12/2025
Web Media Forum made a significant donation to  Chief Minister’s Relief Fund

Web Media Forum made a significant donation to Chief Minister’s Relief Fund

02/09/2024
Debbarma: Tipra Motha’s ‘expiry date’ in TTAADC is Jan 2026

Debbarma: Tipra Motha’s ‘expiry date’ in TTAADC is Jan 2026

09/12/2025
BJP holds organizational meeting

BJP holds organizational meeting

27/02/2025
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia