Thursday, April 9, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

Govt targets 500MW renewable power generation in TEDA state by 2030: Chief Minister

neindia by neindia
04/10/2023
in Local
0
Govt targets 500MW renewable power generation in TEDA state by 2030: Chief Minister
0
SHARES
16
VIEWS
Share on FacebookShare on Twitter

 

Agartala, October 4: The government has set a target of generating 500 MW of renewable electricity in Teda state by 2030. Chief Minister Professor (Dr.) Manik Saha said this while inaugurating a workshop on ‘Shakti Parwaran in Tripura’ at Hotel Polo Tower today.

READ ALSO

CM Saha Visits Injured BJP Leader, Promises Action

CM Saha Hits Out at TIPRA Motha on ADC Polls

On this day, he said, along with the increase in population, the demand for energy is also increasing day by day. Energy is essential in every aspect of life nowadays. There is currently no way to deny the magnitude of the resultant force.

Inaugurating the workshop organized by the Department of Electricity and Asian Development Bank, the Chief Minister further said that this workshop will play an important role in improving renewable energy in the state to meet the desired goal of energy production in our country.

According to him, renewable energy has become important all over the world in creating a clean environment for future generations and in conserving resources. Our country is leading the developing countries in improving socio-economic standards by keeping the environment clean. The country has given importance to the promotion and expansion of renewable energy. Elkshaya has set a target of 500 GW of renewable energy generation and a commitment to increase 50 percent renewable energy from non-fossil fuels by 2030.

On the occasion, the Chief Minister highlighted the infrastructural development of the state and said that the government has given priority to the establishment of renewable energy centers in the state. TEDA has set up 20 MW renewable energy plants in the state. Tripura Power Generation Limited has undertaken to implement 120 and 84 MW CCGT projects in Rukhia and Baramura instead of 63 and 42 MW OCGT projects. Tripura Power Generation Limited has also started setting up small hydropower plants of 30 MW capacities at various locations in the state.

TEDA has also set a target of generating 500 MW of renewable electricity in the state by 2030. For this purpose, initiatives have been taken to set up solar grid power, floating solar, canal solar, roof top solar, micro grid solar etc. Also, Treda has already signed a MoU with NTPC to install 130 MW of floating solar panels in Damboor reservoir.

The Chief Minister said that renewable energy is currently becoming an important component of the country’s energy planning process. Central and state governments have adopted various policies and programs to promote and expand renewable energy in rural and urban areas.

The Chief Minister said that currently the state has a favorable industrial policy to attract investment in the industrial sector. Based on this, the Chief Minister called upon entrepreneurs from home and abroad to invest in renewable energy production in the state.

 

Tags: Govt targets 500MW renewable power generation in TEDA state by 2030: Chief Minister

Related Posts

CM Saha Visits Injured BJP Leader, Promises Action
Local

CM Saha Visits Injured BJP Leader, Promises Action

08/04/2026
CM Saha Hits Out at TIPRA Motha on ADC Polls
Local

CM Saha Hits Out at TIPRA Motha on ADC Polls

08/04/2026
Congress Gains 84 Voters in Chawmanu
Local

Congress Gains 84 Voters in Chawmanu

08/04/2026
Dharmanagar By-Poll Voting on April 9
Local

Dharmanagar By-Poll Voting on April 9

08/04/2026
Agartala School Earns UNESCO Associate Status
Local

Agartala School Earns UNESCO Associate Status

08/04/2026
TBSE Begins Evaluation of Madhyamik, HS Answer Scripts; Results Expected by May 7
Local

TBSE Begins Evaluation of Madhyamik, HS Answer Scripts; Results Expected by May 7

08/04/2026
Next Post
Sadar District Congress embarking on a Municipal Corporation campaign on 7th October

Sadar District Congress embarking on a Municipal Corporation campaign on 7th October

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025
“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

24/10/2024

EDITOR'S PICK

124 Bn CRPF Conducted Meri Mitti Mera Desh Campaign Phase 2.

124 Bn CRPF Conducted Meri Mitti Mera Desh Campaign Phase 2.

06/10/2023
Nepal: 8 dead in violent protests against social media ban

Nepal: 8 dead in violent protests against social media ban

08/09/2025
CPIM booth office was burnt down by miscreants

Indy Alliance Strategizes for Lok Sabha Polls in Tripura

18/03/2024
Sonamura: Youth Nabbed with Fake Notes Worth ₹8,000

Sonamura: Youth Nabbed with Fake Notes Worth ₹8,000

27/03/2026
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia