Wednesday, January 7, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

Govt targets 500MW renewable power generation in TEDA state by 2030: Chief Minister

neindia by neindia
04/10/2023
in Local
0
Govt targets 500MW renewable power generation in TEDA state by 2030: Chief Minister
0
SHARES
11
VIEWS
Share on FacebookShare on Twitter

 

Agartala, October 4: The government has set a target of generating 500 MW of renewable electricity in Teda state by 2030. Chief Minister Professor (Dr.) Manik Saha said this while inaugurating a workshop on ‘Shakti Parwaran in Tripura’ at Hotel Polo Tower today.

READ ALSO

Assam Rifles, DRI seize 14 kg gold, ₹2.87 cr cash in Agartala

Rehab groups threaten agitation, target state govt

On this day, he said, along with the increase in population, the demand for energy is also increasing day by day. Energy is essential in every aspect of life nowadays. There is currently no way to deny the magnitude of the resultant force.

Inaugurating the workshop organized by the Department of Electricity and Asian Development Bank, the Chief Minister further said that this workshop will play an important role in improving renewable energy in the state to meet the desired goal of energy production in our country.

According to him, renewable energy has become important all over the world in creating a clean environment for future generations and in conserving resources. Our country is leading the developing countries in improving socio-economic standards by keeping the environment clean. The country has given importance to the promotion and expansion of renewable energy. Elkshaya has set a target of 500 GW of renewable energy generation and a commitment to increase 50 percent renewable energy from non-fossil fuels by 2030.

On the occasion, the Chief Minister highlighted the infrastructural development of the state and said that the government has given priority to the establishment of renewable energy centers in the state. TEDA has set up 20 MW renewable energy plants in the state. Tripura Power Generation Limited has undertaken to implement 120 and 84 MW CCGT projects in Rukhia and Baramura instead of 63 and 42 MW OCGT projects. Tripura Power Generation Limited has also started setting up small hydropower plants of 30 MW capacities at various locations in the state.

TEDA has also set a target of generating 500 MW of renewable electricity in the state by 2030. For this purpose, initiatives have been taken to set up solar grid power, floating solar, canal solar, roof top solar, micro grid solar etc. Also, Treda has already signed a MoU with NTPC to install 130 MW of floating solar panels in Damboor reservoir.

The Chief Minister said that renewable energy is currently becoming an important component of the country’s energy planning process. Central and state governments have adopted various policies and programs to promote and expand renewable energy in rural and urban areas.

The Chief Minister said that currently the state has a favorable industrial policy to attract investment in the industrial sector. Based on this, the Chief Minister called upon entrepreneurs from home and abroad to invest in renewable energy production in the state.

 

Tags: Govt targets 500MW renewable power generation in TEDA state by 2030: Chief Minister

Related Posts

Assam Rifles, DRI seize 14 kg gold, ₹2.87 cr cash in Agartala
Local

Assam Rifles, DRI seize 14 kg gold, ₹2.87 cr cash in Agartala

07/01/2026
Rehab groups threaten agitation, target state govt
Local

Rehab groups threaten agitation, target state govt

07/01/2026
Srinagar, Anandanagar unite for first Makar Sankranti Snan
Local

Srinagar, Anandanagar unite for first Makar Sankranti Snan

07/01/2026
VHP demands halt to border trade with Bangladesh
Local

VHP demands halt to border trade with Bangladesh

06/01/2026
Monpui vandalism raises tension in Jampui Hills
Local

Monpui vandalism raises tension in Jampui Hills

06/01/2026
Condolences pour in for former Speaker Biswa Bandhu Sen
Local

Condolences pour in for former Speaker Biswa Bandhu Sen

06/01/2026
Next Post
Sadar District Congress embarking on a Municipal Corporation campaign on 7th October

Sadar District Congress embarking on a Municipal Corporation campaign on 7th October

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025
 CM Stalin to Chair Key DMK Meeting on Electoral Roll Revision Amid Rising Concerns

 CM Stalin to Chair Key DMK Meeting on Electoral Roll Revision Amid Rising Concerns

08/11/2025
“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

24/10/2024

EDITOR'S PICK

CPIM booth office was burnt down by miscreants

Anganwadi Workers Demand Timely Gratuity Payment Following High Court Order

31/05/2024
Dr. BR Ambedkar’s statue Unveil at Assembly premises

Dr. BR Ambedkar’s statue Unveil at Assembly premises

06/12/2023
Left Front Delegation Raises Concerns Over Governance and Public Issues

Left Front Delegation Raises Concerns Over Governance and Public Issues

02/05/2025
Minister attend mega blood donation camp

Minister attend mega blood donation camp

03/02/2024
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia