Monday, September 21, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

Tripura’s international cricket stadium ready by August

admin by admin
01/07/2026
in Local, Politics
0
Tripura’s international cricket stadium ready by August
0
SHARES
10
VIEWS
Share on FacebookShare on Twitter

Agartala, July 1: Tripura is on the verge of making its mark on the international cricket map, with the state’s first international-standard cricket stadium at Narsingarh nearing completion. The Tripura Cricket Association (TCA) on Wednesday expressed confidence that the stadium will be ready by August this year, paving the way for hosting Indian Premier League (IPL) matches and international fixtures from the 2027 season, subject to approval from the Board of Control for Cricket in India (BCCI).

Addressing a press conference, TCA president Tapan Lodh said construction of the stadium has entered its final phase after overcoming several legal and administrative hurdles that had delayed the project. Once completed, it will be Tripura’s first international cricket venue and only the second stadium of its kind in the Northeast.

READ ALSO

Das Says DUSU Results Signal Youth Backing for ‘Viksit Bharat’

Tripura SEC to finalise polling stations by Sept 25

TCA Secretary Subrata Dey and other office-bearers were also present at the briefing.

According to the association, the stadium is being developed to meet BCCI standards required for hosting top-level domestic and international cricket. Lodh said the TCA is hopeful of securing at least one IPL match at the venue once the necessary inspections and approvals are completed.

The stadium is being constructed at a sanctioned cost of Rs 185.13 crore. As of June 30, 2026, works worth nearly Rs 178 crore have been completed. The remaining works, estimated at around Rs 7 crore, include installation of the Integrated Building Management System (IBMS), central air-conditioning, roofing of the main pavilion, media and television production facilities, false ceilings, ACP cladding and advanced fire safety systems.

Significant progress has also been made in installing floodlight infrastructure for day-night matches. The foundations for six high-mast floodlight towers have already been completed, while the lighting units have reached the site and are awaiting installation.

Strategically located at Narsingarh near Agartala and close to the India-Bangladesh border, the stadium is expected to become a major sporting destination for the region. Besides boosting cricket infrastructure in Tripura, the venue is likely to attract spectators from neighbouring Bangladesh and other parts of the Northeast.

Once operational, the stadium is expected to open a new chapter in Tripura’s sporting history by bringing high-profile domestic and international cricket closer to fans and providing local players with exposure to world-class facilities.

Tags: Tripura's international cricket stadium ready by August

Related Posts

Das Says DUSU Results Signal Youth Backing for ‘Viksit Bharat’
Local

Das Says DUSU Results Signal Youth Backing for ‘Viksit Bharat’

20/09/2026
Tripura SEC to finalise polling stations by Sept 25
Local

Tripura SEC to finalise polling stations by Sept 25

20/09/2026
Sitharaman highlights Tripura entrepreneur’s success with MUDRA loans
Local

Sitharaman highlights Tripura entrepreneur’s success with MUDRA loans

19/09/2026
Pradyot Signals Retreat From Active Politics
Local

Pradyot Debbarma questions Tripura’s political culture, hints at stepping back

19/09/2026
Tripura Minister Barman calls for stronger higher education
Local

Tripura Minister Barman calls for stronger higher education

19/09/2026
Six new EMRS campuses in Tripura to open by November
Local

Six new EMRS campuses in Tripura to open by November

19/09/2026
Next Post

Tripura Left seeks withdrawal of doctors' private practice ban

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
124th Birth Anniversary Celebration and Tribute Program for Bharat Keshari Dr. Shyamaprasad Mukherjee.

124th Birth Anniversary Celebration and Tribute Program for Bharat Keshari Dr. Shyamaprasad Mukherjee.

06/07/2024
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023

EDITOR'S PICK

Agartala Government Dental College Celebrates Second Foundation Day

Agartala Government Dental College Celebrates Second Foundation Day

18/12/2024
1400 yaba tablets and heroin were arrested on the banks of Kalibari Dighi, the heart of Dharmanagar city

1400 yaba tablets and heroin were arrested on the banks of Kalibari Dighi, the heart of Dharmanagar city

21/06/2023
The body of the missing person is mysteriously recovered

 Condemn Modi Government’s Moves to Control the Election Commission: CPI(M)

11/08/2023
JRBT results to be announced on Sep 7-8

Minister expresses concern over the current situation in Bangladesh

07/02/2025
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia