Thursday, June 11, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

Plans Underway for Drinking Water Purification Plant at Dumbur Reservoir

admin by admin
27/03/2025
in Local, Politics
0
Plans Underway for Drinking Water Purification Plant at Dumbur Reservoir
0
SHARES
16
VIEWS
Share on FacebookShare on Twitter

 

Agartala: Mar 27: Discussions are set to take place with officials from the Department of Drinking Water and Sanitation regarding the construction of a large-scale drinking water purification plant at the Dumbur reservoir in Dhalai district. Chief Minister Professor (Dr.) Manik Saha shared this update in response to a query raised by BJP MLA Ranjit Das during the fourth day of the Tripura Assembly’s budget session.

READ ALSO

Dharmendra Pradhan Assures Early Appointment of Tripura University VC

Sushanta Chowdhury Sets October Deadline for Chabimura Project

 

The Chief Minister highlighted two innovative drinking water projects initiated by the Department of Water. These include a project at Sadayananda Para under Ranirpur Gram Panchayat in Dumburnagar Block, operational since March 2024 and supplying drinking water to 65 families, and another at Prabhu Ram Para under Naikkachhara Gram Panchayat, awaiting electricity connections to provide drinking water to 55 families once functional. Furthermore, a third project utilizing conserved water from the Dumbur reservoir is operational at Narayan Sardar Para in Raishyabari Block, benefiting 55 families.

 

Detailing the Dumbur reservoir’s water capacity, Dr. Saha explained that it holds approximately 286.9 million liters during the monsoon season, which reduces to 182 million liters in the dry season. He noted that hydropower plants near the reservoir require a minimum of 209.8 crore liters for uninterrupted electricity generation, leading to water shortages for 50 to 70 days during the dry season. The Chief Minister acknowledged technical issues with the hydropower plant’s turbines and emphasized the importance of their repair.

 

Dr. Saha also underlined the critical role of lift irrigation projects and water treatment plants in supporting agricultural irrigation in areas near the Gomati River. He assured that consultations with relevant departments would guide necessary steps to address these challenges.

 

Tags: Plans Underway for Drinking Water Purification Plant at Dumbur Reservoir

Related Posts

Dharmendra Pradhan Assures Early Appointment of Tripura University VC
Local

Dharmendra Pradhan Assures Early Appointment of Tripura University VC

10/06/2026
Sushanta Chowdhury Sets October Deadline for Chabimura Project
Local

Sushanta Chowdhury Sets October Deadline for Chabimura Project

10/06/2026
Special Prayers Held Across India for PM Modi’s 12-Year Milestone
Local

Special Prayers Held Across India for PM Modi’s 12-Year Milestone

10/06/2026
Tripura Honours Farmer Bidhan Das for Organic Farming Success
Local

Tripura Honours Farmer Bidhan Das for Organic Farming Success

10/06/2026
Major Drug Bust at Assam–Tripura Border; Driver Arrested
Local

Major Drug Bust at Assam–Tripura Border; Driver Arrested

10/06/2026
Tripura Govt Appoints Shantanu as New TTAADC CEO
Local

Tripura Govt Appoints Shantanu as New TTAADC CEO

10/06/2026
Next Post
Leader of Opposition Jitendra Chaudhary raised serious procedural concerns against Speaker of TLA

Leader of Opposition Jitendra Chaudhary raised serious procedural concerns against Speaker of TLA

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025
“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

24/10/2024

EDITOR'S PICK

Tipra Motha held election rally at Chakmaghat

Tipra Motha held election rally at Chakmaghat

06/02/2023
Tipra Motha MLA seeks morning train from Churaibari to Agartala

Tipra Motha MLA seeks morning train from Churaibari to Agartala

20/08/2025
Ex-Ranji Cricketer Rajesh Banik Passes Away in Road Accident

Ex-Ranji Cricketer Rajesh Banik Passes Away in Road Accident

01/11/2025
Congress to Stage Sit-in Protest Against Terrorism and Women’s Harassment in Tripura

Congress to Stage Sit-in Protest Against Terrorism and Women’s Harassment in Tripura

13/09/2024
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia