Saturday, February 28, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

MP demands quick implementation of proposed ropeway projects in Tripura

neindia by neindia
08/02/2024
in Local
0
MP demands quick implementation of proposed ropeway projects in Tripura
0
SHARES
18
VIEWS
Share on FacebookShare on Twitter

 

Agartala, Feb 08: Member of Parliament Biplab Kumar Deb has urged swift action on the proposed ropeway projects in the state. These projects, aimed at bolstering tourism, were put forth by the Ministry of Road Transport and Highways.

READ ALSO

Tripura Govt to Bear Medical Expenses of Assault Survivor in Gurugram

Kulabari’s Bamboo Art Survives Modern Pressures

Deb highlighted that a Memorandum of Understanding (MoU) was inked between the National Highways Logistics Management Limited (NHLML) and the Tripura Tourism Development Corporation Limited (TTDCL) in Guwahati on November 11, 2022. The agreement outlined the construction of ropeways connecting several key locations: from Udaipur Railway Station to Matabari, Maharani to Chhabimura, Surmachera, and Jampui Hills.

Despite the passage of over a year since the signing, construction work on these four ropeways is yet to commence. Deb emphasized the critical role these projects play in enhancing tourism and connectivity within Tripura. He has personally communicated his concerns to the Union Minister of Road Transport and Highways, urging prompt action.

The anticipated impact of these ropeway projects is significant, with expectations of increased tourist footfall and a positive boost to the local economy. As Tripura awaits progress, residents and visitors alike hope for smoother travel experiences and a thriving tourism sector.

Tags: MP demands quick implementation of proposed ropeway projects in Tripura

Related Posts

Tripura Govt to Bear Medical Expenses of Assault Survivor in Gurugram
Local

Tripura Govt to Bear Medical Expenses of Assault Survivor in Gurugram

28/02/2026
Local

Kulabari’s Bamboo Art Survives Modern Pressures

28/02/2026
Santirbazar Eye Camp: 33 Patients Get Surgery
Local

Santirbazar Eye Camp: 33 Patients Get Surgery

28/02/2026
AMC to Continue Encroachment Drive, Vendors to Be Relocated: Mayor
Local

AMC to Continue Encroachment Drive, Vendors to Be Relocated: Mayor

28/02/2026
North Tripura Student Acts as SP
Local

North Tripura Student Acts as SP

28/02/2026
Malaynagar Death: Probe Launched
Local

Malaynagar Death: Probe Launched

28/02/2026
Next Post
Left government  and US regime change

Left government  and US regime change

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025
“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

24/10/2024

EDITOR'S PICK

State govt aims to complete Indian Oil Corporation Limited project by 2025: Sushanta

State govt aims to complete Indian Oil Corporation Limited project by 2025: Sushanta

28/11/2023
Primary Education Department Postpones Half-yearly Examinations Due to Floods

Primary Education Department Postpones Half-yearly Examinations Due to Floods

10/09/2024
Those who changes party every five years, their main nervous system is not right: Dr. Manik Saha

Those who changes party every five years, their main nervous system is not right: Dr. Manik Saha

04/12/2023
The body of the missing person is mysteriously recovered

Six Bangladeshi youths detained

30/08/2023
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia