Thursday, October 22, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

Tripura Surpasses 8 MW Rooftop Solar Capacity

admin by admin
25/02/2026
in Local, Politics
0
Tripura Surpasses 8 MW Rooftop Solar Capacity
0
SHARES
15
VIEWS
Share on FacebookShare on Twitter

 

Agartala, February 25: In a major boost to Tripura’s renewable energy sector, the PM Surya Ghar Muft Bijli Yojana has helped the state surpass 8 megawatts (MW) of rooftop solar power generation, marking a key milestone in decentralized energy production.

READ ALSO

Tripura minister inaugurates 3 classrooms, 3 laboratories at Khowai school

Fire breaks out at Shiksha Bhawan in Agartala, cause under investigation

Amid strain on conventional power stations due to natural gas shortages, rooftop solar systems are emerging as a reliable alternative. Across the state, households are increasingly transforming their rooftops, tin sheds and open spaces into micro power stations that feed clean energy directly into the grid.

According to Biswajit Basu, Managing Director of Tripura State Electricity Corporation Limited, 2,350 electricity consumers have installed rooftop solar systems under the scheme, collectively generating over 8 MW. Agartala’s Circle No. 1 leads with 1,389 installations, followed by West Tripura Circle No. 2 (140), Gomati (180), Belonia in South Tripura (190), Sepahijala (145), Dharmanagar in North Tripura (72), Dhalai (68), Khowai (78) and Unakoti (88).

Basu said 2,053 beneficiaries have already received government subsidies totaling ₹17.27 crore. Many households have reduced their electricity bills to zero, while some are earning additional income by exporting surplus power under net metering regulations. A 1 kW rooftop plant typically generates about 100 units of electricity per month—adequate for an average household.

The corporation has set a target of achieving 50 MW of rooftop solar capacity by 2027 and is organizing special enrollment camps to boost participation. A dedicated control room has also been set up at its Agartala office to assist consumers with registration, vendor selection and subsidy claims.

Officials described the 8 MW milestone as a significant step toward making every home an energy producer.

Tags: Tripura Surpasses 8 MW Rooftop Solar Capacity

Related Posts

Tripura minister inaugurates 3 classrooms, 3 laboratories at Khowai school
Local

Tripura minister inaugurates 3 classrooms, 3 laboratories at Khowai school

15/10/2026
Local

Fire breaks out at Shiksha Bhawan in Agartala, cause under investigation

15/10/2026
Local

 Manik Saha to inaugurate Doppler weather radar station, development projects in South Tripura on Oct 28

15/10/2026
 IIIT Agartala’s permanent campus to boost technical education, research in Tripura: Minister
Local

 IIIT Agartala’s permanent campus to boost technical education, research in Tripura: Minister

15/10/2026
 Tripura minister reviews handloom, handicrafts, sericulture projects
Local

 Tripura minister reviews handloom, handicrafts, sericulture projects

14/10/2026
 Tripura Fireman aspirants demand results, threaten larger agitation
Local

 Tripura Fireman aspirants demand results, threaten larger agitation

14/10/2026
Next Post
Charge Sheet Filed; Sessions Trial Soon

Charge Sheet Filed; Sessions Trial Soon

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
124th Birth Anniversary Celebration and Tribute Program for Bharat Keshari Dr. Shyamaprasad Mukherjee.

124th Birth Anniversary Celebration and Tribute Program for Bharat Keshari Dr. Shyamaprasad Mukherjee.

06/07/2024
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023

EDITOR'S PICK

CPIM booth office was burnt down by miscreants

Rail services in Tripura come to standstill

08/01/2024
Tripura Assembly, BJP Office Pay Final Tributes to Late Speaker Bishwabandhu Sen

Tripura Assembly, BJP Office Pay Final Tributes to Late Speaker Bishwabandhu Sen

27/12/2025
neindia logo

Government launches PM Surya Ghar free electricity scheme

06/01/2025
Sudip highlighted the BJP’s unfulfilled promises over the past decade

Sudip highlighted the BJP’s unfulfilled promises over the past decade

11/04/2024
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia