Monday, May 25, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

Long-awaited rail connectivity between Agartala and Kolkata is set to become permanent

neindia by neindia
13/06/2024
in Local
0
CPIM booth office was burnt down by miscreants
0
SHARES
31
VIEWS
Share on FacebookShare on Twitter

 

Agartala, June 13: The long-awaited rail connectivity between Agartala and Kolkata, touching Bangladesh, is set to become a permanent reality. Additionally, the eagerly anticipated Belonia-Pheni-Chittagong railway has received approval. Recently, the Bangladesh Railway Board gave the green light for the Final Location Survey (FLS) of the new railway line connecting India and Bangladesh. The total length of this survey is 861 km.

READ ALSO

Siblings Killed as Lightning Hits Tripura Home

Measles Alert: Tripura Boosts Surveillance Measures

Chief Public Relations Officer Sabyasachi Dey from the North East Frontier Railway revealed that the approved FLS routes for the India-Bangladesh rail link include Bilonia-Pheni-Chittagong. This route spans 131 km, with 38 km of new rail line and 93 km of gauge change. Furthermore, the Gede-Darshana-Ishwardi-Tongi-Bhairab Bazar-Akhaura-Agartala route will undergo a 100 km alteration. Additionally, the proposed Petrapole-Benapole-Nabharan-Jesore-Rupdia-Padmabil-Lohagara-Kashiani-Sivachar-Maba-Nimtala-Gendaria-Dhaka-Tongi-Bhairab Bazar-Akhaura-Agartala route will require a 120 km gauge change. These initiatives aim to strengthen rail connectivity between the two nations.

In parallel, a new alternative route for the North Eastern region will be established in the Farbeshganj-Laxmipur section, spanning 17.60 km. Another new route between Thakurganj and Chatterhat will cover 24.40 km, while the Kumedpur-Ambari Falakatta route necessitates 170 km of new railway line.

Meanwhile, the Balurghat-Hili-Parvatipur-Konia-Lalmanirhat-Mogalhat-Gitaldah section, spanning 32 km, will feature 14 km of new railway line and 18 km of yard change. The proposed Balurghat-Gitaldah-Bamanhat-Sonahat-Golokganj-Dhubri section will extend 56 km, with 38 km of new railway line and 18 km of gauge change. Additionally, a 250 km new railway line is planned for the Balurghat-Hili-Gaibandha-Mahendraganj-Tura-Mendipathar section.

Further expansion includes a 60 km new railway line on the proposed Mangurjan-Pirganj-Thakurgaon-Panchgarh-Haldibari route and an 80 km new railway line on the Dalkhola-Pirganj-Thakurgaon-Panchgarh-Haldibari section. Additionally, the Radhikapur-Biral-Parbatipur-Kaunia-Gitaldah section will cover 32 km, with 14 km of new rail line and 18 km of gauge change.

Sabyasachi Dey also highlighted the surveying of the final location for the rail link between India and Nepal. The Biratnagar-New Mal Junction section will require 190 km of new railway line, while the proposed Golglia-Bhadrapur-Kajli Bazar section will involve 12.5 km of construction. These newly proposed railway lines aim to enhance rail connectivity through the chicken-neck section.

Dey expressed confidence that the Indian government’s commitment to friendly and mutually beneficial relations with neighboring countries, prioritizing rail connectivity, infrastructure development, and people-to-people interactions, will foster increased trade and tourism activities.

Tags: Long-awaited rail connectivity between Agartala and Kolkata is set to become permanent

Related Posts

Siblings Killed as Lightning Hits Tripura Home
Local

Siblings Killed as Lightning Hits Tripura Home

23/05/2026
Measles Alert: Tripura Boosts Surveillance Measures
Local

Measles Alert: Tripura Boosts Surveillance Measures

23/05/2026
Tripura Upgrades 10 Anganwadis to English Medium
Local

Tripura Upgrades 10 Anganwadis to English Medium

23/05/2026
Global Crude Spike Pushes Fuel Prices Higher
Local

Global Crude Spike Pushes Fuel Prices Higher

23/05/2026
Tripura Braces for Rain, Thunderstorms in 24 Hours
Local

Tripura Braces for Rain, Thunderstorms in 24 Hours

23/05/2026
BJP Holds Two-Day Training Camp for Party Workers
Local

BJP Holds Two-Day Training Camp for Party Workers

23/05/2026
Next Post
BJP Organized Victory Rally In Ampi.         

BJP Organized Victory Rally In Ampi.         

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025
“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

24/10/2024

EDITOR'S PICK

MP Biplab Kumar Deb  attend the “North East MP’s Meeting” at New Delhi, organized by Shri Kiren Rijiju Ji

MP Biplab Kumar Deb attend the “North East MP’s Meeting” at New Delhi, organized by Shri Kiren Rijiju Ji

22/12/2022
CPIM booth office was burnt down by miscreants

2 arrested with A total of 132 kg of cannabis

05/01/2024
CPIM booth office was burnt down by miscreants

One arrested with gold ornaments

06/12/2023
CM welcomes 5,050 voters from 1,706 families in BJP

Tripura CM Urges Caution Before Declaring Winter Holidays, Stresses Reliance on Meteorological Data

03/01/2026
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia