Monday, August 31, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

The Project agreement was signed between Government of Tripura and ADB India Resident Mission

neindia by neindia
31/12/2022
in Local
0
The Project agreement was signed between Government of Tripura and ADB India Resident Mission
0
SHARES
6
VIEWS
Share on FacebookShare on Twitter

READ ALSO

Biplab Deb Receives Grand Welcome After National BJP Post

Tripura Minister Sudhanshu Das Joins ‘Mann Ki Baat’

Agartala: Dec 31: To improve energy security, quality of supply, efficiency, and resilience of power sector in Tripura, the state signs the biggest ever agreement of Friday informed Tripura’s Power Minister Jishnu Dev Varma today during a press conference in the secretariat.He added that the historical agreement was signed between the Tripura government’s Power Department and the Asian Development Bank (ADB) which will assist Power Project of Rs 2,275 Crore for Tripura Power Distribution Strengthening and Generation Efficiency Improvement Project.The Project agreement was signed between Brijesh Pandey, Secretary, Power Department on behalf of Government of Tripura and Nilaya Mitash, Officer-in-Charge of ADB’s India Resident Mission.The project will support the government of Tripura’s efforts to strengthen its power sector by replacing inefficient power plants and strengthening the distribution by reduced network losses and to meet increasing demand of electricity to boost the state.Dev Varma, who is also the Finance Minister of the state, accompanied by the power secretary and top official of the Tripura State Electricity Corporation Limited claimed that this will be the biggest single project in the history of Tripura in any infrastructure sector.The project will benefit about 5 – 6 lakh consumers through improved power supply and reliability. The project will generate about 6000 – 6500 jobs directly or indirectly in the state.The project will replace the Rokhia’s existing 63 MW (3X21 MW) Open Cycle power project with a 120 MW Combined Cycle power project which will reduce greenhouse gas emissions through fuel saving.Moreover, the project will increase the efficiency of Gomati Hydel Power Project through its renovation and modernization beside renovate 27 numbers of 33/11 KV sub-stations, installation of 150000 Smart meters, 582 16 KVA and 547 number 25KVA distribution transformers, etc.

Related Posts

Biplab Deb Receives Grand Welcome After National BJP Post
Local

Biplab Deb Receives Grand Welcome After National BJP Post

30/08/2026
Tripura Minister Sudhanshu Das Joins ‘Mann Ki Baat’
Local

Tripura Minister Sudhanshu Das Joins ‘Mann Ki Baat’

30/08/2026
Tripura CM Hands Job Letters to 16 Fire Drivers
Local

Tripura CM Hands Job Letters to 16 Fire Drivers

30/08/2026
Ramnagar Sanghati Club Begins Puja Prep After Khuti Puja
Local

Ramnagar Sanghati Club Begins Puja Prep After Khuti Puja

30/08/2026
Former MP Rebati Tripura Donates Blood in Agartala
Local

Former MP Rebati Tripura Donates Blood in Agartala

30/08/2026
TET-Qualified Aspirants Detained Ahead of Protest March
Local

TET-Qualified Aspirants Detained Ahead of Protest March

29/08/2026
Next Post
Former Chief Minister and MP of Rajya Sobha attend organisational meeting

Former Chief Minister and MP of Rajya Sobha attend organisational meeting

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
124th Birth Anniversary Celebration and Tribute Program for Bharat Keshari Dr. Shyamaprasad Mukherjee.

124th Birth Anniversary Celebration and Tribute Program for Bharat Keshari Dr. Shyamaprasad Mukherjee.

06/07/2024
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025

EDITOR'S PICK

Against odds, Tripura’s Piyush Das gets 97% in CBSE 10

Against odds, Tripura’s Piyush Das gets 97% in CBSE 10

16/04/2026
Four Fishermen Missing After Tornado Hits Dumbur Water Body

Four Fishermen Missing After Tornado Hits Dumbur Water Body

24/03/2024
The body of the missing person is mysteriously recovered

Four people arrested with drug paraphernalia

26/08/2023
150 yrs of Vande Mataram celebrated at Agartala event

150 yrs of Vande Mataram celebrated at Agartala event

23/03/2026
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia