Wednesday, June 24, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

Tense situation in Kailasahar linked to a construction project worth approximately ₹3.5 crores

neindia by neindia
19/03/2025
in Local, Politics
0
Tense situation in Kailasahar linked to a construction project worth approximately ₹3.5 crores
0
SHARES
39
VIEWS
Share on FacebookShare on Twitter

READ ALSO

AGMC, GBP Doctors to Get 20% Pay Hike, Private Practice Barred

Chabimura Project to Be Ready by November, Says Tourism Minister

Agartala: Mar 19: On Wednesday afternoon, a tense situation unfolded in Kailashahar’s Western Market area, when an unidentified individual or group set a motorcycle on fire in front of the Water Resources Executive Engineer’s office. The incident led to panic, with office staff locking themselves inside the premises for safety. As two opposing groups clashed in the vicinity, police were dispatched to control the situation, eventually dispersing both groups after about an hour. The area was secured by a heavy presence of police, TSR, and paramilitary personnel, under the leadership of the Sub-Divisional Police Officer.
The incident is believed to be linked to a construction project worth approximately ₹3.5 crores in the Jalai area, awarded to D.N. Construction, which is being executed by two young men from the northern part of Kailashahar. Over the past five days, local youths from the Chandipur region had been stationed at the office to prevent the contractors from collecting the work order. However, the contractors eventually managed to secure the work order, only to find that the Executive Engineer was on leave and the SDO was unwell when they arrived at the office to begin the project.
Upon arriving at the office on Wednesday, the contractors noticed the burning motorcycle and the presence of a crowd of young men. Allegations surfaced, with local youths from Chandipur claiming that the individuals awarded the contract had set the motorcycle on fire. Both groups accused each other, but no definitive evidence emerged to confirm who was responsible. Firefighters quickly extinguished the blaze, and the police seized the motorcycle for further investigation.
The situation remains unstable, with ongoing disputes over the contract work. If the administration fails to address these tensions promptly, there are concerns that the unrest could escalate further. This follows a prior incident where miscreants had vandalized the Executive Engineer’s office.

Tags: Tense situation in Kailasahar linked to a construction project worth approximately ₹3.5 crores

Related Posts

AGMC, GBP Doctors to Get 20% Pay Hike, Private Practice Barred
Local

AGMC, GBP Doctors to Get 20% Pay Hike, Private Practice Barred

23/06/2026
Chabimura Project to Be Ready by November, Says Tourism Minister
Local

Chabimura Project to Be Ready by November, Says Tourism Minister

23/06/2026
Cancer Patients to Benefit as Tripura Plans Bone Marrow Transplant Unit
Local

Cancer Patients to Benefit as Tripura Plans Bone Marrow Transplant Unit

23/06/2026
BJP Worker Samir Das Hacked to Death; Two Brothers Nabbed
Local

BJP Worker Samir Das Hacked to Death; Two Brothers Nabbed

23/06/2026
Respect, Dignity and Care Must Define Healthcare: Justice Lodh
Local

Respect, Dignity and Care Must Define Healthcare: Justice Lodh

23/06/2026
Local

Tripura Targets Child Health Risks Through Statewide Stop Diarrhoea Campaign

23/06/2026
Next Post
100 students from Tripura will visit ISRO

100 students from Tripura will visit ISRO

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025
124th Birth Anniversary Celebration and Tribute Program for Bharat Keshari Dr. Shyamaprasad Mukherjee.

124th Birth Anniversary Celebration and Tribute Program for Bharat Keshari Dr. Shyamaprasad Mukherjee.

06/07/2024

EDITOR'S PICK

CM attends foundation-laying of several development projects in Jirania

CM attends foundation-laying of several development projects in Jirania

12/02/2025
Former Tipra Motha Chief Urges Stricter Measures Against Corruption

Former Tipra Motha Chief Urges Stricter Measures Against Corruption

21/02/2025
OBC Post-Matric Grant Delay Draws Protest

OBC Post-Matric Grant Delay Draws Protest

02/03/2026
Jishnu Dev Varma’s appointment as Governor, made Tripura proud: CM

Jishnu Dev Varma’s appointment as Governor, made Tripura proud: CM

10/08/2024
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia