Agartala: Jan 03: The long-standing demand of the Teliamura residents is now on the way to implementation by the hands of the MLA Construction of motor sand and electric crematorium with modern facilities is nearing completion It is to be noted that the residents of Teliyamura have been demanding for the construction of this motor stand for a long time But the then left government failed to build a better quality motor sand for the residents of Teliamura In the 2018 assembly election, sitting on the bill of power, the BJP government’s current MLA Kalyani Roy accepted the long-standing demand of Teliamura resident and started the construction work. Currently, the construction work is going on at full speed Once this construction is completed, the long-cherished hopes of Teliamura residents and motor workers will be realized In this context, Kalyani Roy, MLA of 28 Teliamura Assembly Constituency and Chief Constable of the State Assembly, said that a total of 5 crore rupees is being spent for the construction of this motor stand.On the other hand, in the interests of the residents of Teliamura, a demand has been raised for many years to arrange an electric furnace in the crematorium of Teliamura. Acknowledging that demand, arrangements were made to install a power plant at Mahashamshan Ghat with the sole efforts of MLA Kalyani Roy. MLA Kalyani Roy said that about 80 percent of the work has been completed so far MLA Kalyani Roy said that both these works are being completed with great speed