Tuesday, July 14, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

NH-108B Waterlogged, Commuters Face Major Hardship

admin by admin
13/07/2026
in Local, Politics
0
NH-108B Waterlogged, Commuters Face Major Hardship
0
SHARES
4
VIEWS
Share on FacebookShare on Twitter

READ ALSO

AIIMS Examines Child Following MP’s Intervention

CM Reviews Health, Education and Power Services

Agartala, July 13: Continuous monsoon rains have once again exposed the poor condition of the under-construction National Highway-108B in Tripura’s Khowai district, with large stretches of the road turning into a muddy, waterlogged expanse, severely disrupting traffic and causing hardship to commuters.

What appeared at first glance to be a flooded paddy field was, in reality, a section of NH-108B, where rainwater and slush engulfed the roadway following several days of incessant rainfall. The deteriorating condition of the highway on Monday affected connectivity between Khowai, Mohanpur and Agartala, leaving thousands of commuters stranded or delayed.

The worst-affected stretch extends from Belfang through Subalsingh to Mohanbari, where nearly eight kilometres of the under-construction highway became virtually impassable for small vehicles. Motorcycles, auto-rickshaws and cars struggled to negotiate deep mud and waterlogged potholes, while heavy vehicles moved cautiously through the slush, leading to long traffic snarls.

Daily commuters, students, patients, office-goers and transport workers bore the brunt of the disruption. Several vehicles reportedly became stuck in the mud, forcing drivers, helpers and local residents to push them to safety.

Locals alleged that the crisis was not merely the result of heavy rainfall but also reflected delays and deficiencies in the execution of the highway project. They claimed poor-quality construction materials, inadequate soil compaction, lack of proper drainage and slow progress of work had left the road highly vulnerable during the monsoon.

Construction of NH-108B began nearly three years ago, but significant portions of the project remain incomplete. While some sections up to Khowai have been finished, work on the Belfang–Hezamara stretch via Subalsingh continues at a slow pace.

Residents also questioned the highway’s design, alleging that the alignment largely follows the old winding route instead of creating a straighter and safer corridor expected of a national highway.

Monday’s rain left several stretches riddled with water-filled potholes hidden beneath muddy water, making it difficult for motorists to judge road conditions. Soil and debris from nearby hill slopes also slid onto the highway at several locations, further worsening the situation and increasing the risk of accidents.

With the monsoon expected to remain active, residents, transport operators and commuters have demanded immediate restoration and speedy completion of NH-108B. They warned that unless urgent repairs are undertaken, the damaged highway could lead to serious accidents and prolonged disruption of connectivity in the region.

Tags: Commuters Face Major HardshipNH-108B Waterlogged

Related Posts

AIIMS Examines Child Following MP’s Intervention
Local

AIIMS Examines Child Following MP’s Intervention

13/07/2026
CM Reviews Health, Education and Power Services
Local

CM Reviews Health, Education and Power Services

13/07/2026
Heavy Rain Damages Homes in Boxanagar
Local

Heavy Rain Damages Homes in Boxanagar

13/07/2026
Tripura Opens Paddy Procurement Centres for Farmers
Local

Tripura Opens Paddy Procurement Centres for Farmers

13/07/2026
Minister Seeks Centre’s Nod for Textile Projects
Local

Minister Seeks Centre’s Nod for Textile Projects

13/07/2026
University VC Pays Courtesy Visit to Governor
Local

University VC Pays Courtesy Visit to Governor

13/07/2026
Next Post
AIIMS Examines Child Following MP’s Intervention

AIIMS Examines Child Following MP's Intervention

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
124th Birth Anniversary Celebration and Tribute Program for Bharat Keshari Dr. Shyamaprasad Mukherjee.

124th Birth Anniversary Celebration and Tribute Program for Bharat Keshari Dr. Shyamaprasad Mukherjee.

06/07/2024
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025

EDITOR'S PICK

No compromise with quality health care in state: CM   

No compromise with quality health care in state: CM  

09/02/2024
RSS chief Mohan Bhagwat arrives in Tripura on a six-day visit

RSS chief Mohan Bhagwat arrives in Tripura on a six-day visit

23/05/2024
Monday, Union Minister of State Pratima Bhowmik participated in the ‘North-East Security Education and Global Employability Conclave

Monday, Union Minister of State Pratima Bhowmik participated in the ‘North-East Security Education and Global Employability Conclave

10/04/2023
TCSA to Protest Dehradun Attack on Chakma Students

TCSA to Protest Dehradun Attack on Chakma Students

28/12/2025
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia