Thursday, March 26, 2026
Neindia
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender
No Result
View All Result
No Result
View All Result
Home Local

₹43.98-cr Gokulnagar substation launched; Tripura eyes Nepal export

admin by admin
17/10/2025
in Local, Politics
0
₹43.98-cr Gokulnagar substation launched; Tripura eyes Nepal export
0
SHARES
26
VIEWS
Share on FacebookShare on Twitter

 

Agartala, Oct 17:
Tripura is set to take a major step in the regional energy sector, with plans underway to export power to Nepal, Power Minister Ratan Lal Nath announced on Thursday. He said discussions on the proposal were held in New Delhi, and the central government will take the final decision on the matter.

READ ALSO

₹61,000 crore tax notice to LIC; company to contest

MoU signed to boost beauty, wellness training in Tripura

The Minister shared the update while inaugurating the 132 KV Gokulnagar Sub-Station under the NER Power System Improvement Project at the Gokulnagar Rastarmatha Sports Ground. The sub-station, constructed at a cost of ₹43.98 crore, aims to provide uninterrupted and quality power supply to nearly 48,740 families across Bishalgarh, Madhupur, Kamalasagar, and adjoining areas.

Highlighting the state’s progress, Nath said, “Earlier, Tripura had only 7.21 lakh power consumers. In the past seven years, the number has grown to 10.38 lakh. As modernization progresses, demand for power rises, and our government is working to meet that demand efficiently.”

He informed that Tripura now has 21 operational 132 KV sub-stations, up from 12 in 2018, with two more under construction. Similarly, 33 KV sub-stations have increased from 44 to 75, with 18 more underway. The length of 132 KV transmission lines has more than doubled—from 485 km to 986 km—while underground cabling has expanded from 95 km to 571 km.

Nath noted that due to reduced gas availability, the Rokhia power plant’s output has fallen from 63 MW to 19 MW. However, a ₹935-crore World Bank-backed project is being implemented to double generation capacity using combined cycle gas turbine technology.

He also announced plans for an 800 MW pump storage project at Chawmanu and a 400 KV sub-station at Suryamani Nagar, as Tripura continues to supply power to Bangladesh and prepares to extend exports to Nepal.

 

Tags: ₹43.98-cr Gokulnagar substation launched; Tripura eyes Nepal export

Related Posts

₹61,000 crore tax notice to LIC; company to contest
National

₹61,000 crore tax notice to LIC; company to contest

25/03/2026
MoU signed to boost beauty, wellness training in Tripura
Local

MoU signed to boost beauty, wellness training in Tripura

25/03/2026
Local

Santirbazar clash during ADC rallies leaves several injured

25/03/2026
BJP leaders spearhead rallies in Jirania, Mandai
Local

BJP leaders spearhead rallies in Jirania, Mandai

25/03/2026
Big BJP rally in Kanchanpur signals poll push
Local

Big BJP rally in Kanchanpur signals poll push

25/03/2026
CM Saha connects with vendors, ups BJP ADC campaign
Local

CM Saha connects with vendors, ups BJP ADC campaign

25/03/2026
Next Post
Lawyer injured while stopping escape bid at Bishalgarh court

Lawyer injured while stopping escape bid at Bishalgarh court

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

POPULAR NEWS

Tripura University Students Protest Over Exam Results

Tripura University Students Protest Over Exam Results

05/09/2024
BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

BSF Jawan Injured in Mysterious Shooting Incident, Referred to GBP Hospital

21/04/2025
UJJAYANTA  PALACE :

UJJAYANTA PALACE :

01/04/2023
12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

12 Maharashtra Officers Promoted to IAS, Revenue Minister Lauds Milestone

14/07/2025
“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

“Sesh Belay Tumi” Short Film: A Touching Exploration of Love and Loss Premieres in Digital Platforms

24/10/2024

EDITOR'S PICK

Pradyot Kishore to Move Supreme Court Over Tribal Land Rights in Tripura

Pradyot Kishore to Move Supreme Court Over Tribal Land Rights in Tripura

16/10/2025
Police Constable Arrested in Connection with 82 Lakh Rupee Scam

Police Constable Arrested in Connection with 82 Lakh Rupee Scam

26/02/2025
Emergency was a direct attack on Constitution, democracy: CM

Emergency was a direct attack on Constitution, democracy: CM

30/06/2025
CPIM booth office was burnt down by miscreants

BSF DG discussed with BGB on border security

18/03/2023
  • Home
  • About
  • Trender

© 2024 Neindia

No Result
View All Result
  • Home
  • Local
  • Tourism
  • International
  • National
  • Sports
  • Health
  • Article / Featues
  • Video
  • Tender

© 2024 Neindia